Sd.kfz 222
Construction report
The Frame.
 |
 |
 |
 |
Ready to start |
Begin with the frame |
parts cutted. |
Sides done. |
When the two sides are done I started to build the rest of the frame.There are a few spacers and some boxes to put in. Also a few tubes
 |
 |
 |
 |
Drawing |
Parts cutted out |
Finished part |
And glued into the frame |
Putting in the rest of the parts to the frame
Frame is done more or less
Springtime :)
Making the suspension
The gearbox
Transmission gear
The Radiator.
The Engine.